Load shedding Reduces to 6 – 7 Hours Daily

The Nepal Electricity Authority (NEA) on Friday announced to reduce load-shedding to 6-7 hours daily to be effective from Saturday Ashadh 21, 2071 (July 5, 2014).

The state-owned power monopoly said that the reducing power outage hours was possible owing to increase in level of water in rivers.

www.nea.org.np images supportive_docs 6069loadshedding.pdf

Download Full Schedule

Leave a Reply

Recommended Sites